The construction of blockbuster workshop in the ho

2022-08-02
  • Detail

The analyst of China aluminum template production and Asia Chemical consulting new energy and battery materials industry told the reporter of China chemical industry news that the construction of the industrial park's blockbuster workshop was officially started

at 10:17 a.m. on July 26, 2017, fireworks and fireworks were in full swing at the construction site of the China Aluminum formwork Industrial Park project. The civil works of the workshop of Shenzhen bester company, the enterprise settled in the industrial park, officially started construction, marking the beginning of the workshop construction of the China Aluminum formwork Industrial Park project. In addition, other infrastructure construction of the project is in full swing

the planned land area of China Aluminum formwork Industrial Park is 4000 mu, which is divided into four sections: A, B, C and D. the Industrial Park focuses on the production and processing of aluminum formwork and gathers large domestic aluminum formwork manufacturers. The project completed the production and processing enterprises of masonry engineering and related supporting service enterprises in october2018. It integrates R & D, design, technical services, information release, production and processing, engineering construction and installation, lease and sales High tech industrial park integrating warehousing and logistics. 4. The hydraulic oil level of the oil tank shall not be lower than 1/3 of the scale of the liquid level gauge. The progress and retreat switch shall be set to interrupt, and the speed switch shall be set to fast, etc Zone

the planned land area of phase I of the industrial park is 730000 square meters. At present, many aluminum formwork and supporting service enterprises, such as Jiangxi zhite, Shenzhen blockbuster, Hebei maituolin, Meichen sunshine and China model logistics, have officially settled in the industrial park and are about to start construction. It is expected that Enterprises above the end of 2017 will be put into operation and achieve results. After the industrial park is completed and put into operation, it will become a 100 billion level modern aluminum template industry base in China and a new landmark for the development of China's aluminum template industry

at present, the construction of China Aluminum formwork Industrial Park is progressing steadily. Among them, in addition to the formal commencement of the workshop civil works of Shenzhen blockbuster company, Beijing Masson sunshine door and window company, Hebei maxolin aluminum alloy formwork company, Jiangxi zhite new materials Co., Ltd. are also rapidly advancing the infrastructure construction, such as earthwork construction and ground dynamic compaction

Copyright © 2011 JIN SHI